A FIELD-POWER SPECIMEN / BUILT WITH RAIVARI

What
stays on.

The generator stops.
The percentage stays put.
Something still has to give.

Keep the shelter warm. Keep a line open.
Leave a readable account of the choice.

Take the watch
SYNTHETIC / LOCAL REHEARSAL01 generator04 loads240 minutesNo equipment connected

THE CIRCUIT / SIMULATED PRESENT

A small site. A finite reserve.

ELAPSED00:00
FIELD 01 / SUPPORT SITE−5°C / fixed ambient
Power availableNo power flowIllustrative geometry

One minute per step; playback runs at reading speed. Scrubbing rebuilds the account. Earlier choices remain intact.

LATEST EVENT IN THIS ACCOUNT

All four loads are supplied.

EQUIPMENT / INSPECTION

The battery account.

The watch is yours. Jump to minute 4, or follow the worked recovery.

01 / MAKE ROOM

Every load
has a consequence.

Local switches still work when the approval link is down. Shed a deferrable load and watch the reserve last longer. Essential loads keep their place at the front of the allocation.

02 / RECOVER WITH A RECEIPT

Permission
has a shelf life.

An inspection makes a restart possible. A proposal gives it a ten-minute window. Approval must still arrive in time, against the same configuration. Then the machine has to warm up.

  1. 01

    Inspect locally.

  2. 02

    Propose a restart.

    Captures the current configuration revision. It does not start the generator.

  3. 03

    Approve this proposal.

    No restart proposal yet.

The receiver’s account.

These are deterministic specimen receipts, not Raivari transport receipts or signatures. Nothing is sent over a network.

03 / OPEN THE ARITHMETIC

The remaining
hours are made of this.

The plot ends at your cursor. A second line keeps the no-action account alongside it. Both use the same starting conditions; neither is a measurement from the field.

This accountNo-action accountStored energy / kWh
Stored energy through the replay cursor
ENERGY SERVED
ENERGY UNMET
CONVERSION LOSSES
BATTERY-ONLY EQUIVALENTAt current demand, above reserve. Ignores the power limit.
Open the last minute’s energy account

E₁ = E₀ + (charge × 0.94 − discharge ÷ 0.92) ÷ 60. Power in kW; energy in kWh. Generator ramp uses Raivari’s rate limiter, averaged across each one-minute interval. Loads share available power in the listed order. Partial supply is accounting, not a prediction of electrical behaviour.

Inspect the simulated Raivari register projection
Address and scaling from Raivari. Values produced locally by this specimen.
RegisterAddressRawScale / unitObserved

SOC is held after minute 4 while other registers continue. Delivery time alone cannot make that observation fresh. Signed power is shown as a logical integer, not encoded wire bytes.

Read the event ledger through this minute

    Local changes and received outcomes in replay order. Proposals do not become effects until the receiver accepts them. Future events stay outside this view and its export.

    04 / CHANGE THE STARTING CONDITIONS

    A colder battery.
    A different watch.

    Start a separate account. Keep the earlier one in the selector above. Export anything you want to retain beyond this tab.

    THE BOUNDS OF THE STUDY

    A model you can disagree with.

    Battery starts at 62% of temperature-adjusted capacity. The fixed capacity allowance is 1 − 0.006 × (20 − ambient), clamped to 0.65–1. This is an illustrative assumption, not a cell manufacturer’s curve.

    10% stays reserved. Output is limited to 12 kW; charging to 8 kW. Discharge efficiency is 92%, charge efficiency 94%. The 18 kW generator has a three-minute warm-up and a 6 kW/minute ramp. Fuel is assumed sufficient for four hours.

    No electrical load flow, surge currents, voltage, frequency, starter energy, battery ageing, thermal dynamics or protection coordination are modelled. “Inspection” is a simulated operator declaration. No safety clearance or equipment control is implied.

    Watch a short captured recovery

    A screen recording of the worked example, jumping between replay minutes. Synthetic conditions. No audio; descriptive captions are included. The live bench above lets you change the choices.

    WHAT WE BROUGHT FORWARD

    The circuit changes.
    The question stays.

    Coastal watch asks what each station knows after an interruption. Here the interruption consumes something. Waiting costs energy, and an old permission can outlive the conditions that made it reasonable.

    Raivari supplies the unmodified rate limiter, clamp, register addresses and value encoder in this browser. The energy balance, load choices and restart receipt model are new work for this specimen.

    The maritime battery behaviour is not presented as a land-site power solver. Its fixed capacity and measurement noise stay out of this energy account. The pinned source record shows exactly what travelled with us.

    An independent design study in field-support resilience. Synthetic conditions, explicit decisions, inspectable consequences.