WEBVTT

1
00:00:00.280 --> 00:00:07.920
Moth and Gravel. Field Note 16.
The number got better. An AI

2
00:00:07.920 --> 00:00:10.400
narrated edition of the
published note.

3
00:00:13.120 --> 00:00:18.040
A room full of computers is
doing its work. Fans turn, water

4
00:00:18.040 --> 00:00:23.200
moves. Somewhere above the room,
a number gets better. It would

5
00:00:23.200 --> 00:00:28.280
make a reassuring green tile. We
open the account underneath it.

6
00:00:29.800 --> 00:00:34.760
2 hours from the same week. The
material is a public record from

7
00:00:34.760 --> 00:00:39.800
the Energy Systems Integration
Facility. 5 power channels, a

8
00:00:39.800 --> 00:00:45.000
published efficiency ratio, and
a separate weather file. Strewen

9
00:00:45.000 --> 00:00:48.480
Clark and Justin Strelka
published the data set through

10
00:00:48.480 --> 00:00:52.560
what is now the National
Laboratory of the Rockies. We

11
00:00:52.560 --> 00:00:57.400
pinned the source files and kept
1 week, the 14th to the 20th of

12
00:00:57.400 --> 00:01:04.160
July 2025, open on the bench. 2
hours in that week make a useful

13
00:01:04.160 --> 00:01:09.360
pair. During the first, the
facility's estimated mean demand

14
00:01:09.360 --> 00:01:18.800
is 2.683 MW. During the second,
it is 2.953 MW. Demand rises by

15
00:01:18.800 --> 00:01:28.440
10.077% The period efficiency
ratio falls from 1.063015

16
00:01:28.720 --> 00:01:31.840
to 1.052937.

17
00:01:38.200 --> 00:01:43.200
Source clock hours. Energy
estimated from recorded power.

18
00:01:44.040 --> 00:01:50.280
Account A. The 14th of July,
2300 to the following midnight.

19
00:01:51.000 --> 00:01:57.240
Facility energy 2682.661 kWh.

20
00:01:58.280 --> 00:02:07.280
IT energy 2523.635 kWh. Period
PUE

21
00:02:07.760 --> 00:02:11.000
1.063015.

22
00:02:12.240 --> 00:02:19.600
Account B. The 18th of July,
9:00 to 10:00. Facility energy

23
00:02:19.800 --> 00:02:31.720
2952.992 kWh. IT energy 2804.
.529 kWh.

24
00:02:32.240 --> 00:02:42.800
Period PUE 1.052937. PUE is
facility energy divided by IT

25
00:02:42.800 --> 00:02:48.800
energy. A smaller overhead
relative to IT can sit beside a

26
00:02:48.800 --> 00:02:54.280
larger absolute load. Both
numbers can be right. Nothing in

27
00:02:54.280 --> 00:02:58.840
these 2 hours tells us that 1
caused the other. We have no

28
00:02:58.840 --> 00:03:02.440
account of useful computing
work, no controlled

29
00:03:02.440 --> 00:03:07.120
intervention, and no grounds to
call 1 hour a better service.

30
00:03:07.800 --> 00:03:12.360
The pair shows why 1 ratio
cannot carry the whole account.

31
00:03:13.040 --> 00:03:17.840
Keep the units attached. The
file contains power in

32
00:03:17.840 --> 00:03:23.760
kilowatts. Energy needs time. We
treat each reported power as a

33
00:03:23.760 --> 00:03:28.280
point sample. The publisher does
not specify the instrument's

34
00:03:28.280 --> 00:03:32.840
averaging window. Between
neighboring readings, we draw a

35
00:03:32.840 --> 00:03:37.520
straight line, clip it at the
hour boundary, and integrate the

36
00:03:37.520 --> 00:03:41.920
trapezoid underneath it. The
result is an estimate in

37
00:03:41.920 --> 00:03:47.880
kilowatt hours. Every component
uses the same valid intervals.

38
00:03:48.360 --> 00:03:53.640
Missing or negative components
leave time uncovered. A gap over

39
00:03:53.640 --> 00:03:59.520
90 seconds also stays uncovered.
We do not fill silence with zero

40
00:03:59.520 --> 00:04:03.840
demand. The selected week has
complete coverage under that

41
00:04:03.840 --> 00:04:08.240
rule. The larger archive has
missing values and outlying

42
00:04:08.240 --> 00:04:13.560
ratios worth inspecting. The
hourly ratio divides the two

43
00:04:13.560 --> 00:04:17.920
energy totals. Averaging the
sample ratios would answer

44
00:04:17.920 --> 00:04:22.400
another question. It produces a
nearby number here, but

45
00:04:22.400 --> 00:04:27.120
proximity is a poor reason to
lose the definition. The

46
00:04:27.120 --> 00:04:32.160
publisher's time stamps carry no
time zone. We preserve their

47
00:04:32.160 --> 00:04:36.720
clock, including microseconds,
without quietly turning it into

48
00:04:36.720 --> 00:04:40.840
finished time. Weather is
matched only to an earlier

49
00:04:40.840 --> 00:04:45.560
reading on that same source
clock within 90 seconds. The

50
00:04:45.560 --> 00:04:48.960
alignment of the two
instruments' clocks remains

51
00:04:48.960 --> 00:04:54.680
unverified. A room with its own
label. We wanted somewhere to

52
00:04:54.680 --> 00:04:59.600
look while keeping that account
in view. A graphite cabinet

53
00:04:59.600 --> 00:05:04.600
door, a water connection above
it, a working light reflected in

54
00:05:04.600 --> 00:05:09.760
the floor. The room is authored
in meters, with constructed

55
00:05:09.760 --> 00:05:15.560
racks, server faces, valves, and
overhead services. Its lighting

56
00:05:15.560 --> 00:05:20.680
and surfaces can be inspected.
Selecting a system opens its

57
00:05:20.680 --> 00:05:25.600
facility level meter boundary
beside the geometry. The data

58
00:05:25.600 --> 00:05:30.080
does not tell us how many racks
to draw, where they stood, or

59
00:05:30.080 --> 00:05:34.720
what each consumed. The room
makes no such claim. Its

60
00:05:34.720 --> 00:05:39.040
geometry remains an
interpretation. The account

61
00:05:39.200 --> 00:05:43.600
remains recorded. More
convincing materials should make

62
00:05:43.600 --> 00:05:48.920
that distinction easier to read,
not easier to overlook. A

63
00:05:48.920 --> 00:05:54.520
reserve is a choice. A separate
branch lets the recorded hour

64
00:05:54.520 --> 00:05:59.000
meet a chosen grid cap and
battery. At the second hour

65
00:05:59.040 --> 00:06:06.560
demand, a 2.5 MW cap leaves work
for the reserve. A 500 kWh

66
00:06:06.560 --> 00:06:13.200
battery starts at 80%, keeps 10%
in reserve, and delivers 92% of

67
00:06:13.200 --> 00:06:18.400
the energy it discharges. With
the branch's 1 MW output limit,

68
00:06:18.640 --> 00:06:26.520
it supplies 322 kWh. Conversion
loss is 28 kWh. The remaining

69
00:06:26.520 --> 00:06:34.080
accounting shortfall is about
130.992 kWh. Those assumptions

70
00:06:34.120 --> 00:06:39.240
are ours. They model neither a
generator starting nor a server

71
00:06:39.240 --> 00:06:44.560
failing. There is no cooling
response, charging, or workload

72
00:06:44.560 --> 00:06:49.120
rescheduling hidden behind the
button. Change a choice, and the

73
00:06:49.120 --> 00:06:54.080
branch must be calculated again.
Export it, and the assumptions

74
00:06:54.080 --> 00:06:58.240
travel with it. A useful number
should be able to make that

75
00:06:58.240 --> 00:07:03.480
journey from a reassuring tile,
through its arithmetic, back to

76
00:07:03.480 --> 00:07:08.640
what was observed, and what
somebody chose. Method, sources,

77
00:07:08.800 --> 00:07:14.600
limits. What this account can
support. Source. Clark and

78
00:07:14.600 --> 00:07:25.840
Strelka. ESIF Facility PUE data
set. DOI 10.779/3015212.

79
00:07:26.360 --> 00:07:33.720
Credit, DOE/ NREL/ Alliance.
Source use implies no

80
00:07:33.720 --> 00:07:37.520
endorsement. The complete
publisher notice accompanies the

81
00:07:37.520 --> 00:07:42.480
extract and every exported
inspection. The replay retains

82
00:07:42.480 --> 00:07:47.720
10,080 observations and 1 power
observation on either side of

83
00:07:47.720 --> 00:07:52.120
the week for boundary
interpolation. Every hour covers

84
00:07:52.120 --> 00:07:58.160
3,600 seconds under the stated
validity rule. JavaScript energy

85
00:07:58.160 --> 00:08:02.280
integrals are checked against a
separate Python implementation

86
00:08:02.520 --> 00:08:06.160
using 50 digit decimal
arithmetic. This checks

87
00:08:06.160 --> 00:08:10.720
numerical implementation, not
meter calibration. No

88
00:08:10.720 --> 00:08:14.600
calibration uncertainty was
supplied. The publisher's

89
00:08:14.600 --> 00:08:19.360
measurement boundaries include
attributed shared loads. We use

90
00:08:19.360 --> 00:08:23.040
the published channels without
adding that allowance again.

91
00:08:23.720 --> 00:08:28.480
Undocumented heat reuse fields
stay raw. We derive no heat

92
00:08:28.480 --> 00:08:33.080
recovery quantity from them. For
the larger question, Berkeley

93
00:08:33.080 --> 00:08:38.920
Lab's 2025 DOE data center load
flexibility workshop summary and

94
00:08:38.920 --> 00:08:42.960
LUMI's job energy accounting
limits describe different

95
00:08:42.960 --> 00:08:47.320
boundaries around flexibility
and workload energy. Neither

96
00:08:47.320 --> 00:08:51.680
supplies measurements for this
room. Inspect the source hashes

97
00:08:51.840 --> 00:08:57.040
and numerical method. Complete
publisher notice. You have been

98
00:08:57.040 --> 00:09:03.680
listening to Moth and Gravel
Field Notes. The written edition
is at mothandgravel.com.

